Smokvica-Gevgelija Highway Constructed

The E75 Highway, Section Smokvica-Gevgelija was constructed in 2004. CEIM's involvement was to provide laboratory ...

Laboratory Works for Lisiche Dam

Laboratory control works for geomechanics, concrete and asphalt were conducted for the construction of the ...

Laboratory Works for Kozjak Dam

Laboratory control works for geomechanics, concrete and asphalt were conducted for the construction of the ...

Alexander the Great Airport Terminal

In 2010, CEIM provided laboratory control works for geomechanics, concrete and asphalt utilised for the ...

Day Care Center Opens in Prilep

The operations sector at CEIM had the privilege to do the construction work for the ...

Investigating the Vodoca Dam

CEIM controlled the geotechnical investigation works for the 'Vodoca' Dam in Strumica. This project was ...

Restoration of the Turija Dam

The Ministry of Agriculture, Forestry and Water Management commissioned CEIM to do the restoration of ...

A Quarry Drilled in Vratnica

The client Omja Minerals commissioned CEIM to do the investigative drilling works for a quarry ...

Geotechnical Investigations at Lukovo Pole Dam

Geotechnical investigation works were completed for the Lukovo Pole Dam in 2012. This work was ...

Vertical Tower for Turija Dam

CEIM conducted the rehabilitation of the vertical tower at the Turija Dam in Strumica in ...

Wells for the Village of Nerezi

The Ministry of Economy commissioned the drilling of two investigation and exploitation wells for water ...

Wells at Zhivojno REK Bitola

CEIM was involved in the drilling of four exploitation wells at "Zhivojno" REK Bitola. This ...

Wells for the Mine in Bitola

CEIM was involved in the drilling of exploitation wells in the opencast mine coal seams ...

Reconstruction of the Monastery of Archangel Michael

The Institute and Museum of Prilep commissioned CEIM to reconstruct the eastern quarters of the ...

Water Supply System in Kocani

CEIM is constructing wells W600/400mm in Grdovski Orman, that will be used for the water ...

Gas Pipeline Skopje-Kicevo

CEIM performed a detailed geotechnical mapping along the gas pipeline axis, that has a width ...

Stability of the Rzanovo Mine

FENI Industry commissioned CEIM in 2012 to update the geological and geotechnical baselines and the ...

Investigating Lukovo Pole Hydro-Power Systems

In 2011, CEIM conducted geotechnical investigation and testing works of the Lukovo Pole Dam. This ...

Geotechnical Requirements for Industrial Development Zones

In 2011, CEIM conducted geotechnical investigation and testing works of the Lukovo Pole Dam. This ...

Investigating the Locality ‘Zapoc’ and ‘Krivo Dolce’

CEIM recently prepared the geological and mining documentation for conducting detailed geological investigations for the ...

Landscaping the “Presveta Bogorodica” Square

The Municipality of Skopje City Centre engaged CEIM in May 2012 to provide their expert ...